A modern data center with rows of server racks lit by colorful neon blue and pink lights, reflecting on the shiny floor and glass panels.
Mission Critical

Project F6 – Oregon

Horizontal Scroll Background

From site development to fit-out: a 190MW data center campus

Project F6 - Oregon

Suffolk was contracted to build a four-building greenfield campus totaling more than 190MW and valued at more than $500M. Suffolk completed the entire site development scope, constructed the core and shell of the building, and finally completed the entire fit out. The first facility Suffolk built on the campus was also a 48 MW data center. The site has bedrock only one foot below the surface, which required extensive blasting scope to install building foundations and campus utilities.

A modern server room with rows of data racks, glowing with colorful LED lights, and glass panels reflecting the equipment. The floor is glossy, and the room is brightly lit with a blue and purple ambiance.