A modern high school building with palm trees lining the entrance, illuminated by exterior lights at dusk under a colorful sky. A driveway and crosswalk are visible in the foreground.
K-12
Fort Myers, FL

Gateway High School

SQ. FT.

300,000

Owner

The School District of Lee County

Architect

BSSW Architects

Horizontal Scroll Background

Delivering a modern high school campus

Gateway High School

Suffolk provided preconstruction and construction management services for Gateway High School, a three-story prototype campus designed to support approximately 2,000 students. The project includes multiple buildings, athletic fields, parking, and site amenities, along with specialized academies focused on Medical Assisting, Veterinary, Cyber Security, Carpentry, and Engineering.

Wide view of an empty indoor basketball gymnasium with bleachers on both sides, wooden flooring, and basketball hoops at each end. A large winged emblem is at center court. The gym is well-lit with overhead lights.
Horizontal Scroll Background
A spacious, modern auditorium with tiered black seating on the left, an empty stage and floor area, high ceilings with lighting rigs, and a large white projection screen on the right.

Driving cost certainty through preconstruction excellence

Gateway High School

During preconstruction, Suffolk delivered highly accurate and consistent budgeting, achieving just a 0.3% variance from initial concept through 100% design development over a ten-month period. The team also identified $650,000 in value analysis opportunities, with $400,000 accepted by the district, supporting informed decision-making and overall project efficiency.